Effective: January 1, 2023
Water Service Rates:
INSIDE DISTRICT – INCLUDING FLMD AND THE PIÑON DISTRICTS
Customer Charge – per month
Single Family Residential: $12.82
Commercial: based on tap size
5/8 – 1.5 inches – $32.05
2 inches – $68.33
3 inches – $128.20
4 inches – $213.71
6 inches – $427.29
8 inches – $683.69
10 inches – $982.91
Commodity Charge
per 1000 gal. $5.77
OUTSIDE DISTRICT RATES NOT YET ESTABLISHED
Wastewater Service Rates:
INSIDE DISTRICT – INCLUDING FLMD AND THE PIÑON DISTRICTS
Per Customer, Per Month
Single Family Residential – $48.02
Commercial: based on tap size
5/8 – 1.5 inches – $120.05
2 inches – $255.95
3 inches – $480.20
4 inches – $800.49
6 inches – $1,600.51
8 inches – $2,560.91
10 inches – $3,681.69
Commodity Charge – Commercial Only per 1000 gal.- metered water usage or estimated $4.45 if metered water usage is not available
OUTSIDE DISTRICT RATES
Per Customer, Per Month
Single Family Residential: $72.03
Commercial: based on tap size
5/8 – 1.5 inches – $180.08
2 inches – $383.93
3 inches – $720.30
4 inches – $1,200.75
6 inches – $2,400.77
8 inches – $3,841.37
10 inches – $5,522.55
Commodity Charge – Commercial Only per 1000 gal.- metered water usage or estimated $4.45 if metered water usage is not available
Landscaping Maintenance Fee:
Monthly per Single Family Residential – $15
Facilities Development Fee:
Per Single Family Residential – $0
Wastewater Development Fees:
(based on water tap size)
INSIDE DISTRICT
Residential: SFE $6,066
Commercial:
3/4 inch – $6,066
1 inch – $14,405
1.5 inch – $35,212
2 inches – $64,023
3 inches – $134,448
4 inches – $243,288
Water Development Fee:
INSIDE DISTRICT
Residential: SFE $12,529
Commercial:
3/4 inch – $12,529
1 inch – $23,805
1.5 inch – $55,128
2 inches – $101,485
3 inches – $190,441
4 inches – $317,485
New Tap Kit/Inspections Fee:
Per Single Family Residential – $1,410
Commercial – Based on Actual Costs
Non-Resident Bristlecone Recreational Permit Fee:
Annual – $1,000
Non-Sufficient Check Fee (NSF):
Per Occurrence – $40.00
Water Re-Connect Fee:
(after the water has been disconnected):
Per Occurrence – $75.00
Construction Water:
By Permit with Deposit Possible
Per 1000 gallons – $9.50
Acknowledged and Accepted by the Boards of Forest Lakes Metropolitan District and Piñon Pines Metropolitan District Nos. 1, 2 and 3
Piñon Pines Metropolitan Districts 1, 2 and 3
Facilities Development Fee:
Per residential lot – $5,000.00
Commercial and multi-family – per sq. ft – $0.88