Skip to content

Effective: January 1, 2023

Water Service Rates:

INSIDE DISTRICT – INCLUDING FLMD AND THE PIÑON DISTRICTS

Customer Charge – per month

Single Family Residential: $12.82

Commercial: based on tap size
5/8 – 1.5 inches – $32.05
2 inches – $68.33
3 inches – $128.20
4 inches – $213.71
6 inches – $427.29
8 inches – $683.69
10 inches – $982.91

Commodity Charge
per 1000 gal. $5.77

OUTSIDE DISTRICT RATES NOT YET ESTABLISHED

Wastewater Service Rates:

INSIDE DISTRICT – INCLUDING FLMD AND THE PIÑON DISTRICTS

Per Customer, Per Month

Single Family Residential – $48.02

Commercial: based on tap size
5/8 – 1.5 inches – $120.05
2 inches – $255.95
3 inches – $480.20
4 inches – $800.49
6 inches – $1,600.51
8 inches – $2,560.91
10 inches – $3,681.69

Commodity Charge – Commercial Only per 1000 gal.- metered water usage or estimated $4.45 if metered water usage is not available

OUTSIDE DISTRICT RATES

Per Customer, Per Month

Single Family Residential: $72.03

Commercial: based on tap size
5/8 – 1.5 inches – $180.08
2 inches – $383.93
3 inches – $720.30
4 inches – $1,200.75
6 inches – $2,400.77
8 inches – $3,841.37
10 inches – $5,522.55

Commodity Charge – Commercial Only per 1000 gal.- metered water usage or estimated $4.45 if metered water usage is not available

Landscaping Maintenance Fee:

Monthly per Single Family Residential – $15

Facilities Development Fee:

Per Single Family Residential – $0

Wastewater Development Fees:

(based on water tap size)

INSIDE DISTRICT

Residential: SFE $6,066

Commercial:
3/4 inch – $6,066
1 inch – $14,405
1.5 inch – $35,212
2 inches – $64,023
3 inches – $134,448
4 inches – $243,288

Water Development Fee:

INSIDE DISTRICT

Residential: SFE $12,529

Commercial:
3/4 inch – $12,529
1 inch – $23,805
1.5 inch – $55,128
2 inches – $101,485
3 inches – $190,441
4 inches – $317,485

New Tap Kit/Inspections Fee:

Per Single Family Residential – $1,410

Commercial – Based on Actual Costs

Non-Resident Bristlecone Recreational Permit Fee:

Annual – $1,000

Non-Sufficient Check Fee (NSF):

Per Occurrence – $40.00

Water Re-Connect Fee:

(after the water has been disconnected):

Per Occurrence – $75.00

Construction Water:

By Permit with Deposit Possible

Per 1000 gallons – $9.50

Acknowledged and Accepted by the Boards of Forest Lakes Metropolitan District and Piñon Pines Metropolitan District Nos. 1, 2 and 3

Piñon Pines Metropolitan Districts 1, 2 and 3

Facilities Development Fee:

Per residential lot – $5,000.00

Commercial and multi-family – per sq. ft – $0.88

Back To Top